On 12 November 2013 we commenced site works, with the compaction test done we had the levels finalized ready for concrete. We are one street back from the beach so soil is quite sandy. The house is a two story 5 bedroom with majority of the bedrooms upstairs. The block had a wide frontage so we have a 3 car garage across the front to the right of the house.
The 14th of November, footings down ready to box up lower slab, plumbing pre lay done.
16TH November, concrete pour starts for the ground floor slab.