It has been a while since my last post. Things are at the pointy end now and we have started on painting the void areas before the scaffolding was dropped in these areas. The main wall colour we have chosen is British paints Stone Path, the photos are not a good representation of it, its a nice grey/beige.

The exterior is taking shape now the porch roofing has been completed but there are still quite a few details to be finished off on the outside. The tiling starts on Monday, that’s a bit exciting and I guess when it all starts looking more complete. This is also the stressful part where you wonder if all the selection you have made are going to end up looking like they do in your head.

The cabinets are now in production and are due for install at the end of the month, its hard to believe that by the end of this month it will be finished to that extent. The amount of overlapping/organising of the different finishes at this stage is immense, already the install of the timber flooring  has delayed the island bench install as we need it to sit on top of the timber as it has a skirting board around it and we wanted to do away with beading around the base of the cabinets. As with other trades once one thing is delayed it has a knock on effect on everything else. This is the part you wish would run smoothly but never does, needless to say wine consumption in our house in the evening has gone up to cope with the stress.

The end is in sight though now. The next post I will show you the finishes we have chosen.

View looking down to to the great room

View looking down to to the great room chimney breast

Round void window

Round void window

temp balustrauding around void

temp balustrading around void

Ready for garage doors

Ready for garage doors

 

Upper Floor Concrete

After much checking, measuring and checking again the position of plumbing and various other sticky out bits (technical term) we finally have some upstairs concrete.
This is good for getting a perspective of how big the rooms and bathrooms will be and getting a feel for the layout. Upstairs wall panels will be ready to go in a couple of weeks giving the concrete some curing time and from then on we hope a roof.
Below are some pics of the reinforcing and concrete that was completed yesterday.

First floor reo complete

First floor reo complete

First floor reo sitting room and office

First floor reo sitting room and office

 

Upstairs reo, office, bathroom and master

Upstairs reo, office, bathroom and master

Stairs boxed up

Stairs boxed up

Concrete in master and ensuite

Concrete in master and ensuite

Concrete looking from upstairs sitting toward family

Concrete looking from upstairs sitting toward family

Concrete stair well and family room opening

Concrete stair well and family room opening

R9 building product close ups

Some close up shots of the R9wa panel we are using for the build.

External wall panel close up

External wall panel close up

Close up cross section of external wall panel

Close up cross section of external wall panel

Panel track corner detail

Panel track corner detail

window corner detail

window corner detail

internal wall panels

internal wall panels

kitchen window ground floor

kitchen window ground floor

corner window close up

corner window close up

Links: R9wa.com.au