On 12 November 2013 we commenced site works, with the compaction test done we had the levels finalized ready for concrete. We are one street back from the beach so soil is quite sandy. The house is a two story 5 bedroom with majority of the bedrooms upstairs. The block had a wide frontage so we have a 3 car garage across the front to the right of the house.

131112 Pad Preparation #1

pad prep

Levels finalised compaction test complete

Levels finalized compaction test complete

The 14th of November, footings down ready to box up lower slab, plumbing pre lay done.

Footings down ready to box up lower slab

Footings down ready to box up lower slab

Plumbing prelay

Plumbing pre-lay

16TH November, concrete pour starts for the ground floor slab.

Lower slab concrete pour

Lower slab concrete pour

Concrete pour

Concrete pour lower slab

concrete pour

concrete pour

Finished slab

Finished slab right hand side

Slab down front view

Slab down front view

lower slab bathroom plumbing

lower slab bathroom plumbing

 

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s